We are able to perform the installation of instrumentation tubing from 1/8” (3mm) up to 1,1/2” (38mm) with bends and couplings. The installation of tubing includes the assembly of instruments, manifold blocks and valves. Selection and installation of tubing, couplings and valves is in compliance with customer specifications and the industrial standard.
Our expertise can be consulted in the preliminary stage of your project. Skid mounted units up to 20 meters long and weight up to 13 ton can be moved to our professional structured workshop or the instrumentation tubing activities can be performed on location both national and international.
Visual inspection, tightening check and a leaktest are part of our standard procedure. The required test reports and relevant documentation are of course included within the project documentation package.